How To Build a Brick Wall: A Step by Step Overview

Building a brick wall may resemble an easy task, yet it takes a lot of practice as well as proper technique. From making a strong foundation to attaining the best mortar consistency, all actions are equally crucial and also contribute to a sturdy, long-lasting brick wall. For any type of architectural or load-bearing masonry wall, it’s necessary to use a professional. However, for a simple garden brick wall, a DIY approach can be a superb alternative to save cash and also broaden your experience.

Building a brick wall does not need to be discouraging. We’ve placed with each other an action by step overview listed below to get you on the right course if you’re asking yourself where to obtain started! This guide is just one means of building a wall: along the way you might make added visual or useful choices and still end up with a wonderful outcome.

Products Needed

You’ll need the list below materials to build your brick wall:

  • Trowel
  • Hammer
  • Strengthen
  • Level
  • Shovel
  • Wheelbarrow
  • Bricks
  • String as well as clamps (or nails).
  • Dry bristle brush.

Step # 1: Calculate How Many Bricks You Required.
The first step is to determine the amount of bricks you will need for your task. Bricks can be found in a range of various shapes and sizes, with the typical UK brick gauging 215mm long x 102.5 mm deep x 65mm high. Don’t neglect to represent mortar, which is generally 10mm thick.

Prior to you do anything, you will need to measure the area you require. As a regulation of thumb, there are 60 bricks per square meter for a single skin wall (fifty percent brick wall) and also 120 bricks per square meter for a one brick thick solid wall. For a more full guide, see our Just how Many Bricks Do I Required?

Step # 2: Order Your Bricks.
If you require to match to existing brickwork, use our brick matching service or if it does not need to match, simply ask us to find you a brick with our complimentary brick option service. We’ll obtain you the ideal brick supplied at the ideal price when you require it, so you can be confident in your wall prior to it’s even built! You can then obtain the remainder of the products from your neighborhood DIY store.

Step # 3: Prepare Your Foundation.
One of the most essential components of a brick wall is the foundation. For referral, you will need a half a meter deep trench for a brick wall up to one meter in elevation.

Drive wood stakes to find the optimal height for your bricks in your trench. Spread out the stakes two to four feet apart (depending upon the length of your wall) and also guarantee they are totally degree. The initial row of bricks need to rest flush in the foundation. Load the foundation with concrete, making sure to maintain it level as well as fill to the top of the stakes. Leave it to completely dry for 2 – 3 days.

Action # 4: Mark Your Rule of thumbs.
You need to establish up gauging rods to guarantee your brickwork is continually level when you have your foundation. The simplest means to do this is to obtain a piece of timber and cut it to the elevation of your completed wall. Next off, mark 65mm lines (if making use of typical sized bricks) to determine where each row (also referred to as a training course) must be. Ensure these are freestanding as well as in the ground at either end of your stonework wall.

Set up a string line from one evaluating rod to the various other. This will certainly be for your second row of bricks, as the first string will be being in the trench. See to it the line is straight and also level with no droop.

Action # 5: Mix Your Mortar.
Make certain you follow producer guidelines, as the strength of your wall can depend on your mortar mix. Just mix what you require as well as do not let the mortar rest for more than an hour or two.

Soak the bricks in water as well as let them drip dry. This will make certain that they bond appropriately with the mortar. Although, see to it that there is no water running off the bricks as it can make the mortar as well wet.

Step # 6: Lay Your Initial Brick.
Once the foundation is dry, it’s time to begin! Area mortar on the foundation and make a ‘v’ form along the mortar with your trowel. Producing a ‘v’ designed trench spreads the mortar out and also makes it less complicated to lay the course. Place the brick in the mortar and also press it strongly into area, making sure to make it degree.

Order the following brick and also add mortar to the short side before placing it down hard up against the initial brick. Inspect that the bricks are flush using the spirit level. Guarantee you regularly maintain 10mm of mortar between the bricks.

Action # 7: Cut a Brick in Half For The Next Row.
Make certain your string line is set up for this row to recognize the height you need to attain. Bricks must always be startled to provide extra toughness and assistance. A staggered wall implies you may require to cut a brick in fifty percent!

Order your brick and faucet strongly in the center with the pointed end of your hammer. Your brick needs to break in half if you do this correctly. If you’re a little inexperienced, it may be best to use a strengthen and also a hammer – it can additionally give a cleaner cut. Location the bolster in the centre of the brick and faucet firmly using your hammer. A fracture should begin to show up. Strike the boost hard once more, as well as the brick should break away easily. It does not need to be a totally tidy cut, as the harsh sides can help attach the brick to the mortar.

Step # 8: Repeat the Process to Build Your Brick Wall.
Now it’s time for the second training course! Beginning the row by positioning the cut brick down on a bed of mortar. See to it your string line remains in the best place, as well as the brick meets the string. Area the next brick, check that it is flush and continue. Repeat the process till you have completed the second program.

Continue functioning your means upward up until you get to the desired height. Move the string line with each row and continuously examine that your wall is level. Do not forget to include the 10mm for mortar!

Step # 9: Finishing Your Wall.
It’s time to add the finishing touches as soon as you have gotten to the last height. Depending upon the function of your stonework wall, you might decide to use various joining patterns. One instance could be a soldier training course, where bricks are turned vertically, with the ends encountering out. There are many different variants you can utilize to boost the aesthetic looks of your wall. Once you have all bricks in position, do a fast spot check as well as spot any gaps with mortar along the wall using the trowel.

Look at the brick wall utilizing a soft brush to remove any type of excess mortar before it dries out. Make sure you clean up any mortar that has fallen on the ground too. You will certainly additionally need to cover your wall overnight with a tarp or polythene sheet to shield it from the aspects such as rain or frost. This is momentary and also must only be needed for the first night.

If you’re matching the brick to existing brickwork, you may require to tint and/or weather the brickwork. This will already be covered in our matching procedure. As soon as your wall is finished, you can use the code offered from your brick acquisition to get 20% off this process.

Congratulations, you have actually constructed a brick wall! Connect with the team at BBW Group Ltd if you need assistance picking the bricks for your next task.