Building a brick wall may resemble a basic job, but it takes a great deal of practice as well as appropriate technique. From making a strong foundation to attaining the appropriate mortar consistency, all actions are just as vital and contribute to a tough, long-lasting brick wall. For any kind of load-bearing or structural stonework wall, it’s essential to employ an expert. For a simple yard brick wall, a DIY approach can be an excellent option to conserve money as well as broaden your experience.

Building a brick wall does not need to be intimidating. We have actually placed together a step by action overview below to obtain you on the ideal training course if you’re wondering where to get begun! This guide is simply one means of building a wall: in the process you might make added aesthetic or functional choices and also still wind up with a wonderful outcome.

Materials Needed

You’ll require the following products to build your brick wall:

  • Trowel
  • Hammer
  • Reinforce
  • Level
  • Shovel
  • Wheelbarrow
  • Bricks
  • String as well as clamps (or nails).
  • Dry bristle brush.

Action # 1: Calculate The Amount Of Bricks You Required.
The very first step is to identify how many bricks you will certainly need for your project. Bricks are available in a range of different shapes and sizes, with the common UK brick gauging 215mm lengthy x 102.5 mm deep x 65mm high. Do not fail to remember to make up mortar, which is typically 10mm thick.

Before you do anything, you will need to measure the location you need. As a rule of thumb, there are 60 bricks per square meter for a single skin wall (half brick wall) as well as 120 bricks per square meter for a one brick thick solid wall. For a more full overview, see our How Lots of Bricks Do I Required?

Step # 2: Order Your Bricks.
If you require to match to existing brickwork, utilize our brick matching solution or if it doesn’t require to match, simply ask us to find you a brick with our complimentary brick choice solution. We’ll get you the right brick supplied at the right cost when you need it, so you can be confident in your wall prior to it’s even built! You can then obtain the remainder of the materials from your neighborhood Do It Yourself shop.

Step # 3: Prepare Your Foundation.
Among the most important parts of a brick wall is the foundation. This is the assistance for your wall, and the trench size will certainly depend upon the width and elevation of your stonework wall. For recommendation, you will certainly need a half a meter deep trench for a brick wall as much as one meter in elevation. See to it you examine the dimensions before digging as a strong trench is necessary to prevent your wall from collapsing.

Drive wooden risks to find the optimal elevation for your bricks in your trench. Spread the stakes 2 to 4 feet apart (depending upon the length of your wall) and guarantee they are entirely level. The very first row of bricks should sit flush in the foundation. Fill the foundation with concrete, making certain to keep it degree and fill to the top of the risks. Leave it to completely dry for 2 – 3 days.

Step # 4: Mark Your Rule of thumbs.
When you have your foundation, you need to set up assessing poles to ensure your brickwork is continually level. The easiest method to do this is to get an item of wood and also suffice to the height of your completed wall. Next, mark 65mm lines (if making use of conventional sized bricks) to determine where each row (likewise referred to as a program) ought to be. See to it these are freestanding and in the ground at either end of your masonry wall.

Establish a string line from one determining rod to the various other. This will certainly be for your 2nd row of bricks, as the first string will be being in the trench. Make certain the line is straight as well as level with no sag.

Action # 5: Mix Your Mortar.
Next off, blend your mortar on an old damp board. See to it you adhere to producer instructions, as the strength of your wall can rely on your mortar mix. The mortar must slip conveniently from your shovel, although the mixture needs to be firm sufficient to hold its form. Just blend what you require and do not allow the mortar sit for more than an hour or 2.

Saturate the bricks in water as well as let them leak dry. This will certainly make sure that they bond appropriately with the mortar. Although, see to it that there is no water escaping the bricks as it can make the mortar as well wet.

Action # 6: Lay Your First Brick.
When the foundation is completely dry, it’s time to start! Place mortar on the foundation as well as make a ‘v’ shape along the mortar with your trowel. Creating a ‘v’ shaped trench spreads out the mortar out as well as makes it much easier to lay the course. Place the brick in the mortar and also press it strongly into place, taking care to make it degree.

Order the next brick as well as include mortar to the short edge prior to putting it down hard up against the initial brick. Touch it into location and also remove any kind of excess mortar with your trowel. The remaining mortar can be reused as long as it is devoid of any dirt or debris. Repeat the process for the very first program. Inspect that the bricks are flush making use of the level. Ensure you consistently maintain 10mm of mortar between the bricks. Otherwise, the toughness of your wall may be endangered.

Step # 7: Cut a Brick in Half For The Next Row.
Make certain your string line is set up for this row to recognize the elevation you need to accomplish. Bricks must constantly be startled to provide extra strength and also assistance. Nonetheless, a staggered wall suggests you may need to reduce a brick in half!

If you do this correctly, your brick should damage in half. Place the strengthen in the centre of the brick as well as tap securely using your hammer. It doesn’t require to be a completely tidy cut, as the harsh sides can aid attach the brick to the mortar.

Action # 8: Repeat the Refine to Build Your Brick Wall.
Currently it’s time for the 2nd program! Beginning the row by putting the cut brick down on a bed of mortar. Make certain your string line is in the ideal location, and the brick satisfies the string. Place the following brick, check that it is flush and also continue. Repeat the procedure up until you have actually completed the second program.

Continue functioning your method upward up until you reach the wanted height. Move the string line with each row and also continuously examine that your wall is level. Don’t forget to include the 10mm for mortar!

Step # 9: Completing Your Wall.
It’s time to include the finishing touches once you have actually gotten to the last height. Depending upon the purpose of your stonework wall, you may decide to utilize various signing up with patterns. One instance could be a soldier training course, where bricks are transformed vertically, with the ends facing out. There are many different variants you can utilize to boost the visual appearances of your wall. Do a fast area check and spot any kind of gaps with mortar along the wall utilizing the trowel once you have all bricks in location.

Go over the brick wall utilizing a soft brush to remove any type of excess mortar before it dries out. Make certain you clean up any mortar that has fallen on the ground also. You will additionally need to cover your wall overnight with a tarp or polythene sheet to safeguard it from the aspects such as rainfall or frost. This is momentary and should just be required for the first night.

You might require to weather the brickwork and/or tint if you’re matching the brick to existing brickwork. This will currently be covered in our matching procedure. You can utilize the code offered from your brick purchase to get 20% off this process as soon as your wall is finished.

Congratulations, you have actually developed a brick wall! Contact the team at BBW Group Ltd if you need assistance picking the bricks for your next job.